وثيقة
Investigation on factors causing construction delay and their effects on the development of Oman’s construction industry.
المعرف
DOI: 10.21303/2461-4262.2022.001865
المصدر
EUREKA, Physics and Engineering. v. 2022, 6, p. 33-44
المساهمون
الدولة
Estonia.
مكان النشر
Tallinn
الناشر
Scientific Route.
ميلادي
2022-11-29
اللغة
الأنجليزية
الموضوع
الملخص الإنجليزي
Construction delay in projects is a common manifestation in the construction industry. Delay in construction will lead to a bad relationship between the parties involved and will also lead to an increase in the allocated completion time. Delay in the ongoing project might result in the loss of the money, time and other facilities by the client and cause a lot of financial damage to the contractor due to its investment in the purchase of equipment, construction materials and the hire of skilled workers. Delay in construction is a common problem that occurs mostly due to the unforeseen problems during the design & construction stages which often lead to delays in the completion of the project. Oman’s construction industry is one of the most important industries for the country’s economic development and growth. In this study, analysis of some available literature was conducted, and a question-naire survey was f loated among contractors, consultants, clients, project managers, and engineers involved in construction projects. All the collected responses were evaluated by using SPSS. The results of the study identified a total of 60 causes of delay out of which three factors have a «High» significance level for construction delays. These factors of «High» significance were associated with «Client related issues only» in which the initial design was altered by the client, delaying in deciding by the client and, scope change by the client. Majority of the delay (84 %) was observed to be lying in the range of 1–2 years. This study also recognized the effect and minimization of regular delay and delay resulted due to Covid-19. Minimizing construction delay criteria can be managed by having a proper control system in the project time and funds.
ISSN
2461-4254
قالب العنصر
مقالات الدوريات